International Monetary Fund
Moldova, Republic of: Financial Position in the Fund

Member Financial Data



Moldova, Republic of: Projected Payments to the IMF
as of December 31, 2023



Projected charges/interest and due dates are tentative. GRA charges are due two business days following notification to members shortly after quarter end. Net SDR charges and annual SDR assessments are due on the first day after the end of the quarter and April 30, respectively. RST interest is due promptly after the end of the quarter.

Download this file
TSV -- TSV tips

(in SDRs)
Description Schedule Date Total
Amount Due
PRGT Repayment (ECF)  January 05, 2024800,000
GRA Repurchase (RFI)  January 19, 202414,375,000
GRA Basic Charges  February 01, 20244,372,750
GRA Level Based Surcharge  February 01, 2024100,222
Net SDR Charges  February 01, 20242,895,764
GRA Repurchase (EFF)  March 22, 20241,866,666
GRA Repurchase (RFI)  April 19, 202414,375,000
GRA Repurchase (EFF)  April 26, 2024875,000
SDR Assessments  April 30, 20243,716
GRA Basic Charges  May 01, 20244,296,623
GRA Level Based Surcharge  May 01, 202493,283
Net SDR Charges  May 01, 20242,767,950
GRA Repurchase (EFF)  May 08, 20241,441,666
PRGT Repayment (ECF)  May 08, 2024520,000
PRGT Repayment (ECF)  May 15, 2024870,000
GRA Repurchase (EFF)  June 21, 2024875,000
GRA Repurchase (EFF)  June 28, 20241,333,333
PRGT Repayment (ECF)  June 28, 2024520,000
PRGT Repayment (ECF)  July 03, 2024800,000
GRA Repurchase (RFI)  July 19, 202414,375,000
GRA Basic Charges  August 01, 20244,153,932
GRA Level Based Surcharge  August 01, 202411,515
Net SDR Charges  August 01, 20242,829,460
GRA Repurchase (EFF)  September 13, 2024800,000
GRA Repurchase (EFF)  September 24, 20241,866,666
GRA Repurchase (RFI)  October 21, 202414,375,000
GRA Repurchase (EFF)  October 28, 2024875,000
Net SDR Charges  November 01, 20242,829,460
GRA Basic Charges  November 01, 20243,939,294
GRA Repurchase (EFF)  November 08, 20241,441,666
PRGT Repayment (ECF)  November 08, 2024520,000
PRGT Repayment (ECF)  November 15, 2024870,000
GRA Repurchase (EFF)  December 20, 2024875,000
PRGT Repayment (ECF)  December 24, 2024520,000
GRA Repurchase (EFF)  December 24, 20241,333,333
Total for the year 2024104,797,299
 
PRGT Repayment (ECF)  January 03, 2025800,000
GRA Repurchase (RFI)  January 21, 202514,375,000
Net SDR Charges  February 01, 20252,832,072
GRA Basic Charges  February 01, 20253,699,091
GRA Repurchase (EFF)  March 13, 2025800,000
GRA Repurchase (EFF)  March 24, 20251,866,666
PRGT Repayment (ECF)  March 28, 20251,120,000
GRA Repurchase (RFI)  April 21, 202514,375,000
GRA Repurchase (EFF)  April 28, 2025875,000
SDR Assessments  April 30, 20253,716
Net SDR Charges  May 01, 20252,744,694
GRA Basic Charges  May 01, 20253,374,953
PRGT Repayment (ECF)  May 09, 2025520,000
GRA Repurchase (EFF)  May 09, 20251,441,666
PRGT Repayment (ECF)  May 15, 2025870,000
GRA Repurchase (EFF)  June 20, 2025875,000
GRA Repurchase (EFF)  June 27, 20251,333,333
PRGT Repayment (ECF)  June 27, 2025520,000
PRGT Repayment (ECF)  July 04, 2025800,000
GRA Basic Charges  August 01, 20253,266,743
Net SDR Charges  August 01, 20252,837,212
GRA Repurchase (EFF)  September 12, 2025800,000
PRGT Repayment (ECF)  September 19, 2025480,000
GRA Repurchase (EFF)  September 24, 20251,866,666
PRGT Repayment (ECF)  September 30, 20251,120,000
PRGT Repayment (RCF)  October 21, 20255,750,000
GRA Repurchase (EFF)  October 28, 2025875,000
GRA Basic Charges  November 01, 20253,232,389
Net SDR Charges  November 01, 20252,837,212
PRGT Repayment (ECF)  November 07, 2025520,000
GRA Repurchase (EFF)  November 07, 20251,441,666
PRGT Repayment (ECF)  November 14, 2025870,000
GRA Repurchase (EFF)  December 22, 2025875,000
PRGT Repayment (ECF)  December 29, 2025520,000
GRA Repurchase (EFF)  December 29, 20251,333,333
Total for the year 202581,851,412
 
PRGT Repayment (ECF)  January 05, 2026800,000
Net SDR Charges  February 01, 20262,837,212
GRA Basic Charges  February 01, 20263,174,147
GRA Repurchase (EFF)  March 13, 2026800,000
PRGT Repayment (ECF)  March 19, 2026480,000
GRA Repurchase (EFF)  March 24, 20261,866,666
PRGT Repayment (ECF)  March 30, 20261,120,000
PRGT Repayment (RCF)  April 21, 20265,750,000
GRA Repurchase (EFF)  April 28, 2026875,000
SDR Assessments  April 30, 20263,716
Net SDR Charges  May 01, 20262,744,694
GRA Basic Charges  May 01, 20263,037,213
PRGT Repayment (ECF)  May 08, 2026520,000
GRA Repurchase (EFF)  May 08, 20261,441,666
PRGT Repayment (ECF)  May 15, 2026870,000
GRA Repurchase (EFF)  June 22, 20263,175,000
GRA Repurchase (EFF)  June 22, 2026875,000
GRA Repurchase (EFF)  June 29, 20261,333,333
PRGT Repayment (ECF)  June 29, 2026520,000
PRGT Repayment (ECF)  July 03, 2026800,000
Net SDR Charges  August 01, 20262,837,212
GRA Basic Charges  August 01, 20263,064,399
GRA Repurchase (EFF)  September 11, 2026800,000
PRGT Repayment (ECF)  September 18, 2026480,000
GRA Repurchase (EFF)  September 24, 20261,866,666
PRGT Repayment (ECF)  September 30, 20261,120,000
PRGT Repayment (RCF)  October 21, 20265,750,000
GRA Repurchase (EFF)  October 28, 2026875,000
GRA Basic Charges  November 01, 20263,006,436
Net SDR Charges  November 01, 20262,837,212
GRA Repurchase (EFF)  November 09, 20261,441,674
PRGT Repayment (ECF)  November 09, 2026520,000
PRGT Repayment (ECF)  November 13, 2026870,000
GRA Repurchase (EFF)  November 13, 20263,616,666
GRA Repurchase (EFF)  December 22, 2026875,000
GRA Repurchase (EFF)  December 22, 20263,175,000
GRA Repurchase (EFF)  December 29, 20261,333,333
PRGT Repayment (ECF)  December 29, 2026520,000
Total for the year 202668,012,245
 
PRGT Repayment (ECF)  January 05, 2027800,000
Net SDR Charges  February 01, 20272,837,212
GRA Basic Charges  February 01, 20272,890,057
GRA Repurchase (EFF)  March 12, 2027800,000
PRGT Repayment (ECF)  March 19, 2027480,000
GRA Repurchase (EFF)  March 23, 2027927,083
GRA Repurchase (EFF)  March 24, 20271,866,666
PRGT Repayment (ECF)  March 30, 20271,120,000
PRGT Repayment (RCF)  April 21, 20275,750,000
GRA Repurchase (EFF)  April 28, 2027875,000
SDR Assessments  April 30, 20273,716
GRA Basic Charges  May 01, 20272,729,060
Net SDR Charges  May 01, 20272,744,694
PRGT Repayment (ECF)  May 07, 2027520,000
GRA Repurchase (EFF)  May 13, 20273,616,666
GRA Repurchase (EFF)  June 22, 2027875,000
PRGT Repayment (ECF)  June 22, 20271,905,000
GRA Repurchase (EFF)  June 22, 20273,175,000
GRA Repurchase (EFF)  June 29, 20271,333,333
PRGT Repayment (ECF)  June 29, 2027520,000
PRGT Repayment (ECF)  July 05, 2027800,000
GRA Repurchase (EFF)  July 09, 2027927,083
GRA Basic Charges  August 01, 20272,712,977
Net SDR Charges  August 01, 20272,837,212
GRA Repurchase (EFF)  September 13, 2027800,000
PRGT Repayment (ECF)  September 17, 2027480,000
GRA Repurchase (EFF)  September 23, 2027927,083
GRA Repurchase (EFF)  September 24, 20271,866,666
PRGT Repayment (ECF)  September 30, 20271,120,000
PRGT Repayment (RCF)  October 21, 20275,750,000
GRA Repurchase (EFF)  October 28, 20274,325,000
GRA Basic Charges  November 01, 20272,634,653
Net SDR Charges  November 01, 20272,837,212
PRGT Repayment (ECF)  November 12, 20276,475,000
GRA Repurchase (EFF)  November 12, 20273,616,666
GRA Repurchase (EFF)  December 22, 2027875,000
PRGT Repayment (ECF)  December 22, 20271,905,000
GRA Repurchase (EFF)  December 22, 20273,175,000
GRA Repurchase (EFF)  December 29, 20271,333,333
PRGT Repayment (ECF)  December 29, 2027520,000
Total for the year 202781,686,372
 
PRGT Repayment (ECF)  January 05, 2028800,000
GRA Repurchase (EFF)  January 11, 2028927,083
GRA Basic Charges  February 01, 20282,480,199
Net SDR Charges  February 01, 20282,834,600
GRA Repurchase (EFF)  March 13, 2028800,000
PRGT Repayment (ECF)  March 17, 2028480,000
GRA Repurchase (EFF)  March 23, 2028927,083
PRGT Repayment (ECF)  March 23, 2028952,500
GRA Repurchase (EFF)  March 24, 20281,866,666
PRGT Repayment (ECF)  March 30, 20281,120,000
PRGT Repayment (RCF)  April 21, 20285,750,000
GRA Repurchase (EFF)  April 28, 20284,325,000
SDR Assessments  April 30, 20283,716
Net SDR Charges  May 01, 20282,767,950
GRA Basic Charges  May 01, 20282,346,507
GRA Repurchase (EFF)  May 12, 20283,616,666
PRGT Repayment (ECF)  May 12, 20286,475,000
GRA Repurchase (EFF)  June 08, 20284,325,000
PRGT Repayment (ECF)  June 22, 20281,905,000
GRA Repurchase (EFF)  June 22, 20283,175,000
GRA Repurchase (EFF)  June 29, 20281,333,337
PRGT Repayment (ECF)  July 05, 2028800,000
GRA Repurchase (EFF)  July 11, 2028927,083
PRGT Repayment (ECF)  July 11, 2028952,500
GRA Basic Charges  August 01, 20282,219,811
Net SDR Charges  August 01, 20282,829,460
GRA Repurchase (EFF)  September 13, 2028800,000
PRGT Repayment (ECF)  September 19, 2028480,000
GRA Repurchase (EFF)  September 22, 2028927,083
GRA Repurchase (EFF)  September 22, 20281,866,666
PRGT Repayment (ECF)  September 22, 2028952,500
PRGT Repayment (ECF)  September 29, 20281,120,000
PRGT Repayment (RCF)  October 20, 20285,750,000
PRGT Repayment (ECF)  October 27, 20281,905,000
GRA Repurchase (EFF)  October 27, 20284,325,000
Net SDR Charges  November 01, 20282,829,460
GRA Basic Charges  November 01, 20282,124,123
PRGT Repayment (ECF)  November 13, 20286,475,000
GRA Repurchase (EFF)  November 13, 20283,616,666
GRA Repurchase (EFF)  December 08, 20284,325,000
GRA Repurchase (EFF)  December 22, 20283,175,000
PRGT Repayment (ECF)  December 22, 20281,905,000
Total for the year 202899,516,659
 
GRA Repurchase (EFF)  January 11, 2029927,083
PRGT Repayment (ECF)  January 11, 2029952,500
Net SDR Charges  February 01, 20292,832,072
GRA Basic Charges  February 01, 20291,953,988
GRA Repurchase (EFF)  March 13, 2029800,000
PRGT Repayment (ECF)  March 19, 2029480,000
GRA Repurchase (EFF)  March 23, 2029927,083
PRGT Repayment (ECF)  March 23, 2029952,500
GRA Repurchase (EFF)  March 23, 20291,866,666
PRGT Repayment (ECF)  March 30, 20291,120,000
PRGT Repayment (RCF)  April 20, 20295,750,000
PRGT Repayment (ECF)  April 27, 20291,905,000
GRA Repurchase (EFF)  April 27, 20294,325,000
SDR Assessments  April 30, 20293,716
GRA Basic Charges  May 01, 20291,812,304
Net SDR Charges  May 01, 20292,744,694
GRA Repurchase (EFF)  May 11, 20293,616,666
PRGT Repayment (ECF)  May 11, 20296,475,000
GRA Repurchase (EFF)  June 08, 20294,325,000
PRGT Repayment (ECF)  June 08, 20291,905,000
GRA Repurchase (EFF)  June 22, 20293,175,000
PRGT Repayment (ECF)  June 22, 20291,905,000
GRA Repurchase (EFF)  July 11, 2029927,083
PRGT Repayment (ECF)  July 11, 2029952,500
Net SDR Charges  August 01, 20292,837,212
GRA Basic Charges  August 01, 20291,700,859
GRA Repurchase (EFF)  September 13, 2029800,000
PRGT Repayment (ECF)  September 19, 2029480,000
PRGT Repayment (ECF)  September 21, 2029952,500
GRA Repurchase (EFF)  September 21, 2029927,083
GRA Repurchase (EFF)  September 24, 20291,866,674
PRGT Repayment (ECF)  September 28, 20291,120,000
PRGT Repayment (RCF)  October 19, 20295,750,000
PRGT Repayment (ECF)  October 26, 20291,905,000
GRA Repurchase (EFF)  October 26, 20294,325,000
Net SDR Charges  November 01, 20292,837,212
GRA Basic Charges  November 01, 20291,616,200
PRGT Repayment (ECF)  November 13, 20296,475,000
GRA Repurchase (EFF)  November 13, 20293,616,666
GRA Repurchase (EFF)  December 07, 20294,325,000
PRGT Repayment (ECF)  December 07, 20291,905,000
GRA Repurchase (EFF)  December 21, 20293,175,000
PRGT Repayment (ECF)  December 21, 20291,905,000
Total for the year 2029101,153,261
 
PRGT Repayment (ECF)  January 11, 2030952,500
GRA Repurchase (EFF)  January 11, 2030927,083
Net SDR Charges  February 01, 20302,837,212
GRA Basic Charges  February 01, 20301,443,008
GRA Repurchase (EFF)  March 13, 2030800,000
PRGT Repayment (ECF)  March 19, 2030480,000
GRA Repurchase (EFF)  March 22, 2030927,083
PRGT Repayment (ECF)  March 22, 2030952,500
PRGT Repayment (RCF)  April 19, 20305,750,000
PRGT Repayment (ECF)  April 26, 20301,905,000
GRA Repurchase (EFF)  April 26, 20304,325,000
SDR Assessments  April 30, 20303,716
Net SDR Charges  May 01, 20302,744,694
GRA Basic Charges  May 01, 20301,324,964
PRGT Repayment (ECF)  May 13, 20306,475,000
GRA Repurchase (EFF)  May 13, 20303,616,666
PRGT Repayment (ECF)  June 07, 20301,905,000
GRA Repurchase (EFF)  June 07, 20304,325,000
GRA Repurchase (EFF)  June 21, 20303,175,000
PRGT Repayment (ECF)  June 21, 20301,905,000
GRA Repurchase (EFF)  July 11, 2030927,083
PRGT Repayment (ECF)  July 11, 2030952,500
GRA Basic Charges  August 01, 20301,211,302
Net SDR Charges  August 01, 20302,837,212
PRGT Repayment (ECF)  September 23, 2030952,500
GRA Repurchase (EFF)  September 23, 2030927,083
GRA Repurchase (EFF)  October 28, 20304,325,000
PRGT Repayment (ECF)  October 28, 20301,905,000
GRA Basic Charges  November 01, 20301,143,547
Net SDR Charges  November 01, 20302,837,212
PRGT Repayment (ECF)  November 13, 20306,475,000
GRA Repurchase (EFF)  November 13, 20303,616,666
PRGT Repayment (ECF)  December 06, 20301,905,000
GRA Repurchase (EFF)  December 06, 20304,325,000
GRA Repurchase (EFF)  December 20, 20303,175,000
PRGT Repayment (ECF)  December 20, 20301,905,000
Total for the year 203086,194,531
 
GRA Repurchase (EFF)  January 10, 2031927,083
PRGT Repayment (ECF)  January 10, 2031952,500
Net SDR Charges  February 01, 20312,837,212
GRA Basic Charges  February 01, 2031986,610
GRA Repurchase (EFF)  March 21, 2031927,083
PRGT Repayment (ECF)  March 21, 2031952,500
PRGT Repayment (ECF)  April 28, 20311,905,000
GRA Repurchase (EFF)  April 28, 20314,325,000
SDR Assessments  April 30, 20313,716
GRA Basic Charges  May 01, 2031891,148
Net SDR Charges  May 01, 20312,744,694
GRA Repurchase (EFF)  May 13, 20313,616,666
PRGT Repayment (ECF)  May 13, 20316,475,000
PRGT Repayment (ECF)  June 06, 20311,905,000
GRA Repurchase (EFF)  June 06, 20314,325,000
PRGT Repayment (ECF)  June 20, 20311,905,000
GRA Repurchase (EFF)  June 20, 20313,175,000
PRGT Repayment (ECF)  July 11, 2031952,500
GRA Repurchase (EFF)  July 11, 2031927,083
GRA Basic Charges  August 01, 2031765,323
Net SDR Charges  August 01, 20312,837,212
PRGT Repayment (ECF)  September 23, 2031952,500
GRA Repurchase (EFF)  September 23, 2031927,083
GRA Repurchase (EFF)  October 28, 20314,325,000
PRGT Repayment (ECF)  October 28, 20311,905,000
GRA Basic Charges  November 01, 2031698,616
Net SDR Charges  November 01, 20312,837,212
PRGT Repayment (ECF)  November 13, 20316,475,000
GRA Repurchase (EFF)  November 13, 20313,616,666
PRGT Repayment (ECF)  December 08, 20311,905,000
GRA Repurchase (EFF)  December 08, 20314,325,000
GRA Repurchase (EFF)  December 22, 20313,175,000
PRGT Repayment (ECF)  December 22, 20311,905,000
Total for the year 203177,383,407
 
GRA Repurchase (EFF)  January 09, 2032927,083
PRGT Repayment (ECF)  January 09, 2032952,500
GRA Basic Charges  February 01, 2032543,199
Net SDR Charges  February 01, 20322,834,600
PRGT Repayment (ECF)  March 23, 2032952,500
GRA Repurchase (EFF)  March 23, 2032927,083
GRA Repurchase (EFF)  April 28, 20324,325,000
PRGT Repayment (ECF)  April 28, 20321,905,000
SDR Assessments  April 30, 20323,716
GRA Basic Charges  May 01, 2032464,968
Net SDR Charges  May 01, 20322,767,950
GRA Repurchase (EFF)  May 13, 20323,616,674
PRGT Repayment (ECF)  May 13, 20326,475,000
PRGT Repayment (ECF)  June 08, 20321,905,000
GRA Repurchase (EFF)  June 08, 20324,325,000
GRA Repurchase (EFF)  July 09, 2032927,083
PRGT Repayment (ECF)  July 09, 2032952,500
Net SDR Charges  August 01, 20322,829,460
GRA Basic Charges  August 01, 2032339,057
PRGT Repayment (ECF)  September 23, 2032952,500
GRA Repurchase (EFF)  September 23, 2032927,087
GRA Repurchase (EFF)  October 28, 20324,325,000
PRGT Repayment (ECF)  October 28, 20321,905,000
GRA Basic Charges  November 01, 2032293,719
Net SDR Charges  November 01, 20322,829,460
GRA Repurchase (EFF)  December 08, 20324,325,000
PRGT Repayment (ECF)  December 08, 20321,905,000
Total for the year 203255,436,139
 
GRA Repurchase (EFF)  January 11, 2033927,087
PRGT Repayment (ECF)  January 11, 2033952,500
GRA Basic Charges  February 01, 2033198,079
Net SDR Charges  February 01, 20332,832,072
PRGT Repayment (ECF)  April 28, 20331,905,000
GRA Repurchase (EFF)  April 28, 20334,325,000
SDR Assessments  April 30, 20333,716
GRA Basic Charges  May 01, 2033159,633
Net SDR Charges  May 01, 20332,744,694
GRA Repurchase (EFF)  June 08, 20334,325,000
PRGT Repayment (ECF)  June 08, 20331,905,000
Net SDR Charges  August 01, 20332,837,212
GRA Basic Charges  August 01, 203378,607
GRA Basic Charges  November 01, 203355,630
Net SDR Charges  November 01, 20332,837,212
GRA Repurchase (EFF)  December 08, 20334,325,000
PRGT Repayment (ECF)  December 08, 20331,905,000
Total for the year 203332,316,442
 
Net SDR Charges  February 01, 20342,837,212
GRA Basic Charges  February 01, 203422,373
SDR Assessments  April 30, 20343,716
Net SDR Charges  May 01, 20342,744,694
Net SDR Charges  August 01, 20342,837,212
Net SDR Charges  November 01, 20342,837,212
Total for the year 203411,282,419
 
Net SDR Charges  February 01, 20352,837,212
SDR Assessments  April 30, 20353,716
Net SDR Charges  May 01, 20352,744,694
Net SDR Charges  August 01, 20352,837,212
Net SDR Charges  November 01, 20352,837,212
Total for the year 203511,260,046
 
Net SDR Charges  February 01, 20362,834,600
SDR Assessments  April 30, 20363,716
Net SDR Charges  May 01, 20362,767,950
Net SDR Charges  August 01, 20362,829,460
Net SDR Charges  November 01, 20362,829,460
Total for the year 203611,265,186
 
Net SDR Charges  February 01, 20372,832,072
SDR Assessments  April 30, 20373,716
Net SDR Charges  May 01, 20372,744,694
Net SDR Charges  August 01, 20372,837,212
Net SDR Charges  November 01, 20372,837,212
Total for the year 203711,254,906
 
Net SDR Charges  February 01, 20382,837,212
SDR Assessments  April 30, 20383,716
Net SDR Charges  May 01, 20382,744,694
Net SDR Charges  August 01, 20382,837,212
Net SDR Charges  November 01, 20382,837,212
Total for the year 203811,260,046
 
Net SDR Charges  February 01, 20392,837,212
SDR Assessments  April 30, 20393,716
Net SDR Charges  May 01, 20392,744,694
Net SDR Charges  August 01, 20392,837,212
Net SDR Charges  November 01, 20392,837,212
Total for the year 203911,260,046
 
Net SDR Charges  February 01, 20402,834,600
SDR Assessments  April 30, 20403,716
Net SDR Charges  May 01, 20402,767,950
Net SDR Charges  August 01, 20402,829,460
Net SDR Charges  November 01, 20402,829,460
Total for the year 204011,265,186
 
Net SDR Charges  February 01, 20412,832,072
SDR Assessments  April 30, 20413,716
Net SDR Charges  May 01, 20412,744,694
Net SDR Charges  August 01, 20412,837,212
Net SDR Charges  November 01, 20412,837,212
Total for the year 204111,254,906
 
Net SDR Charges  February 01, 20422,837,212
SDR Assessments  April 30, 20423,716
Net SDR Charges  May 01, 20422,744,694
Net SDR Charges  August 01, 20422,837,212
Net SDR Charges  November 01, 20422,837,212
Total for the year 204211,260,046
 
Net SDR Charges  February 01, 20432,837,212
SDR Assessments  April 30, 20433,716
Net SDR Charges  May 01, 20432,744,694
Net SDR Charges  August 01, 20432,837,212
Net SDR Charges  November 01, 20432,837,212
Total for the year 204311,260,046
 
Net SDR Charges  February 01, 20442,834,600
SDR Assessments  April 30, 20443,716
Net SDR Charges  May 01, 20442,767,950
Net SDR Charges  August 01, 20442,829,460
Net SDR Charges  November 01, 20442,829,460
Total for the year 204411,265,186
Total 912,235,786

Short Description Description
Net SDR ChargesSDR Department - Net Charges
GRA Basic ChargesGeneral Resources Account - BASIC Charges
PRGT Repayment (RCF)Principal - Rapid Credit Facility
GRA Repurchase (EFF)Extended Fund Facility Arrangement - Obligation
PRGT Repayment (ECF)Principal - Extended Credit Facility
GRA Repurchase (RFI)Principal - Rapid Financing Instrument
SDR AssessmentsSDR Department - Member Assessment
GRA Level Based SurchargeLevel Based Surcharge

Disclaimer
The information provided is for your convenience and is not intended to replace other official IMF reports and statements.